270th ECB: Documents: Unit Report 4

HEADQUARTERS
270th ENGINEER COMBAT BATTALION
APO 461 US ARMY
UNIT REPORT NO. 4

091800A to 101800 Hrs.
10 February 1945

A. Headquarters reporting 270th Engr. C Bn.
Location of Headquarters: Merlebach Q 3262

H. Location and type of road and bridge construction:

1. 1 25 ton timber bridge one way at Q 497574 completed by Co. B and prepared for demolition. Demolition material : 150 lbs TNT with both electric and non electric circuits. Bridge guarded by Engineer guards.

I.

1. Co. A on maintenance of roads:

Q460544 to Q451550
Q434551 to Q43005425
Q419520 to Q421528
Q353528 to Q355540

2. Co. A repaired railroad crossing at Hundling (Q449565)

3. Co. A improved bridge approaches at Q434551

K.

1. All Companies continue with checking and guarding of obstacles on line A and forward.

FOR THE COMMANDING OFFICER:
(Signature)
R.P. Murphy
Major CE
S-3