270th ECB: Documents: Unit Report 41

HEADQUARTERS
270th ENGINEER COMBAT BATTALION
APO 461 US ARMY
UNIT REPORT NO. 41

181800A to 191800A
19 March 1945

A. Headquarters reporting 270th Engr. (C) Bn.
Location of Headquarters: Merlebach Q 3262

E. 1. Underpass at Q398720 cleared.

I. Road repair and maintenance:

1. One way signs posted on road at Q425685.
2. Abatis reported from Q42107085 to Q421577095
3. Prepared fill and removed 36' M2 Treadway (unreadable) AT Ditch. This bridge (Corp. No. 221) was erroneously reported as being 72' in length. Treadway attacked at bridge site (unreadable)
4. Maintenance of MSR in vic of Q466658.
5. Maintenance of MSR from Q464674 to Q 464678.
6. Maintenance of MSR at Q441661.

K.

1. Schumine field fenced in vic. Q336703
2. Following road blocks widened for 2 way traffic:

Q404698
Q406703
Q40857065
Q404699
3. Reconnoitered and fenced A Per. mine field at Q421709.
4. Prepared 2 AT gun positions at Q40807105 and Q40807115
5. Hauled Engr. Materials to Platoon dumps.
 

FOR THE COMMANDING OFFICER:
(Signature)
R.P. Murphy
Major CE
S-3
 